Sign In | Join Free | My disqueenfrance.com
China Hefei Coolnet power  Co., ltd logo
Hefei Coolnet power Co., ltd
Hefei Coolnet power Co., ltd
Verified Supplier

5 Years

Home > Prefabricated Data Center >

Modular Structure Prefabricated Data Center for Fast and Flexible Needs

Hefei Coolnet power Co., ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Modular Structure Prefabricated Data Center for Fast and Flexible Needs

  • 1
  • 2
  • 3

Brand Name : COOLNET

Model Number : HCDC

Certification : CE,ROHS,ISO

Place of Origin : CHINA

MOQ : 1 set

Price : 8000-30000USD per set

Payment Terms : L/C, T/T

Supply Ability : 200 sets per month

Delivery Time : 15-20days

Packaging Details : Standard shipping 20/40 ft container with classification society certification

Name : Container Data Center

Color : White Or Black

Static Payload : 1100kg

Rack Quantities : 4-10PCS

Material : 2.0mm Cold Rolled Steel

Two Ends Doors : Sliding /manual Doors Optional

Power Input : 2 City Power+ 1 Generator, Or 1 City Power +1 Generator

Custom Logo Lable : Yes

Battery back up time : 5-20mins

Diesel Generator Module : Extraposition

Contact Now

Containerized Data Center is a new, modular data center solution that integrates traditional data center facilities and equipment into standard containers to provide efficient, flexible, and scalable computing and storage resources. This form of design aims to provide a computing environment that can be quickly deployed, easily expanded, and has a low construction cost through standardized shipping containers.

The internal components of the mobile data center include: cabinets, power distribution cabinets, UPS, batteries, air conditioners, fire protection, security and monitoring systems.

container size: standard 20ft/40ft or non-standard custom size.

Modular Structure Prefabricated Data Center for Fast and Flexible Needs

Applications
Enterprise: Small Data Center
Operator: Small IT room, small IDC, DR room and edge DC
Government: Smart City, Safe City Data Center
Education: University/Institute Data Center
Energy: Production/Investigation Field Data Center
Finance: Backup data center
Transportation: Airport/Railway/Port without housing power supply and distribution

Modular Structure Prefabricated Data Center for Fast and Flexible Needs

Feature

  • Low PUE, can save a lot of power resources, reduce power consumption, reduce carbon emissions, energy saving and environmental protection.
  • Intelligent management system, 3D visual monitoring, near-end PAD management function, support customized mobile APP management function, unattended computer room.

Modular Structure Prefabricated Data Center for Fast and Flexible Needs

  • The in-row air conditioner is close to the heat source, and the cold aisle/hot aisle is closed, which can avoid the loss of cooling capacity caused by the mixing of cold and hot air, and water cooling.
  • The bottom of the container is equipped with a support, and the bottom is sealed to effectively prevent the impact of water accumulation on the container. Containers can withstand harsh climates with high security guarantees.
PRODUCT PARAMETERS ICDC-20 ICDC-20
Container Size 20’HQ 40’HQ
Rack Specification 600*1000(1100)*2000mm 600*1000(1100)*2000mm
Single Rack Capacity 42U 42U
Rack Quantity 4PCS 8-10PCS
Single Rack Capacity 3-10KW 3-10KW
IT Equipment Total Capacity 12-30kw 24-75KW
UPS 25kva*2 N+1 modular UPS 25kva*4 N+1 modular UPS
Battery back up time 5-15mins 5-20mins
Cooling In-row air conditioner In-row air conditioner
Monitoring system YES YES
Door Security System YES YES
Fire alarm and gas fire extinguishing system YES YES
Video Monitoring System YES YES
EPO YES YES
Transportability Support Support
Stackable Support Support
Application Outdoor Type Outdoor Type
Diesel Generator Module Extraposition Extraposition

Customer value

  • Easy of location:Not limited by climatic and geographical conditions, portable data center can be deployed in difficult areas. Relocation is flexible.
  • Rapid deployment:It takes 2-3 years for a traditional data center to be built, while a new generation of prefabriceted data center takes only 2-3 months, it can be used when plugged in.
  • Low construction cost:Traditional data centers have a long construction period and require high starting capital. The capital cost of prefab data center construction is much lower than that of traditional data centers.

Modular Structure Prefabricated Data Center for Fast and Flexible Needs


China Modular Structure Prefabricated Data Center for Fast and Flexible Needs wholesale

Modular Structure Prefabricated Data Center for Fast and Flexible Needs Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Hefei Coolnet power Co., ltd
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0